6-story, 150,000 sf retail and office building with a connected parking structure
Convergys Office Building at International Parkway (formerly Cincinnati Bell Information Systems)
3-story, 125,000 sf office building with adjacent 60,000 sf data center
Mizner Park Office Building
7-story, 163,818 sf office building
Dr. Phillips Headquarters Office Building
2-story, 21,730 sf; L-shaped building with a 2-story office area
Heathrow 400 Office Building at International Parkway
4-story, 90,000 sf office building
Heathrow 701 Office Building at International Parkway
4-story, 130,000 sf office building
Heathrow 901 Office Building at International Parkway
4-story, 180,000 sf office building
Peninsula Corporate Center
3-story, 45,803 sf office building with a central fountain courtyard
Heathrow 801 Office Building at International Parkway
5-story, 150,000 sf office building
Heathrow 600 Office Building at International Parkway
3-story, 120,000 sf office building
Signature Flight, Flight Based Operations, Newark International Airport
Phase II: Partial renovation of existing hangar and expansion of existing terminal building
Signature Flight, NetJets Flight Based Operations Terminal, Palm Beach International Airport
10,000 +/- sf aviation terminal building
Signature Flight, Chicago (O’Hare) Airport Terminal
1-story, 6,200 sf (with 620 sf VIP area for charters) executive aviation terminal building and 1-story, 1,720 sf ground support equipment maintenance facility for 150 vehicles; LEED Certified Silver
Opa Locka Airport Terminal (Orion)
Phase 1: 3-story, 19,819 sf Flight Based Operations terminal with airside canopy and porte cochere, 86,400 sf of hangars, 38,800 sf of office space and Phase 2: 80,000 sf of hangars, 20,000 sf office
American Aero Aviation, Historic Hangar Renovation
4 phases (1: 40,000 sf hangar, 4,000 sf shops, 8,000 sf Flight Based Operations; 2: 40,000 sf hangar; 3: 10,000 sf shops / possible garage; 4: future 10,000 sf office / shops) with possible Phase 5 with 14,000 sf tenant hangar and office / shops